NEW πŸ“—Story: Caffeine ❌

Uranium

Read more: Strategic Materials Reserve
Uranium Raw material Energy
Production56.2 t p.a.
Exports0 mg
Value per tonne✦151,500
Revenue✦8.52 m
Value added✦8.38 m
Surplus✦3.41 m
  • Per tonne:
  • Labour ✦1,324 (Sf 2.76)
  • Materials ✦0
  • Capital ✦87,000
  • Energy ✦2,500
  • Surplus ✦60,680

Whole chain per tonne: 30 labour hours, 50,000 kWh.

Formula

A.C. = w0LhSf Labour ✦1,324 Shadow wage w0 ✦16 an hour Γ— Lh 30 hours per tonne Γ— skill factor Sf 2.76 Sf for energy: training ✦60,000 against ✦45,000, queue 30 hours against 48 + Ξ£ qiPirΞ»i Materials ✦0 A raw material, with no recipe inputs. + (D + Mo)Ξ±e Capital ✦87,000 Depreciation and maintenance ✦60,000 per tonne Γ— financing 1.45 Γ— waste factor Ξ±e 1.00 Financing is interest at 6% on equipment's average value over a 15-year life. Ξ±e is 1.00 when maintenance hours and defects are on target. + Epe Energy ✦2,500 E 50,000 kWh per tonne Γ— pe ✦0.05 per kWh = ✦90,820

A.V. = rP*world Accounted value ✦151,500 per tonne World price $100,000 per tonne plus freight and insurance 1.02% = P* $101,000 Γ— r 1.5 crowns per US dollar Import parity: the price at the Commonwealth border for a good it could otherwise import. Observed abroad, not calculated: a wasteful producer raises only its own cost. = ✦151,500

Revenue = A.V. Γ— Q Accounted revenue ✦8.52 m p.a. Domestic: 56.2 t Γ— ✦151,500 = ✦8.51 m = ✦8.52 m

Surplus = (A.V. βˆ’ A.C.) Γ— Q βˆ’ levies Accounted surplus ✦3.41 m p.a. Revenue ✦8.52 m βˆ’ cost ✦90,820 Γ— 56.2 t = ✦3.41 m Distributed 40% to reinvestment, 20% to the municipal aggregate and 40% swept to the Treasury. = ✦3.41 m

Made here
Supplies or uses it
Inputs arriving
Output leaving

Made in

Output

Nuclear Reactors ✦3.06 m Final domestic use ✦5.45 m

Made from per tonne

A raw material: no recipe inputs.

Used in p.a.