- Per tonne:
- Labour β¦56.2 (Sf 2.34)
- Materials β¦0
- Capital β¦95.7
- Energy β¦12.5
- Surplus β¦699
Whole chain per tonne: 1.5 labour hours, 250 kWh.
Formula
A.C. = w0LhSf Labour β¦56.2 Shadow wage w0 β¦16 an hour Γ Lh 1.5 hours per tonne Γ skill factor Sf 2.34 Sf for industry: training β¦45,000 against β¦45,000, queue 20 hours against 48 + Ξ£ qiPirΞ»i Materials β¦0 A raw material, with no recipe inputs. + (D + Mo)Ξ±e Capital β¦95.7 Depreciation and maintenance β¦66 per tonne Γ financing 1.45 Γ waste factor Ξ±e 1.00 Financing is interest at 6% on equipment's average value over a 15-year life. Ξ±e is 1.00 when maintenance hours and defects are on target. + Epe Energy β¦12.5 E 250 kWh per tonne Γ pe β¦0.05 per kWh = β¦164
A.V. = rP*world Accounted value β¦863 per tonne World price $550 per tonne plus freight and insurance 4.64% = P* $575 Γ r 1.5 crowns per US dollar Import parity: the price at the Commonwealth border for a good it could otherwise import. Observed abroad, not calculated: a wasteful producer raises only its own cost. = β¦863
Revenue = A.V. Γ Q Accounted revenue β¦36.4 m p.a. Domestic: 42,150 t Γ β¦863 = β¦36.4 m = β¦36.4 m
Surplus = (A.V. β A.C.) Γ Q β levies Accounted surplus β¦29.5 m p.a. Revenue β¦36.4 m β cost β¦164 Γ 42,150 t = β¦29.5 m Distributed 40% to reinvestment, 20% to the municipal aggregate and 40% swept to the Treasury. = β¦29.5 m
Made in
Output
Made from per tonne
A raw material: no recipe inputs.
Used in p.a.
- Final domestic use 42,150 t β¦36.4 m 100%